I have a 1500 Sqft Garage that I'm planning to use 2-part, all solid, epoxy and I need to know how much, and what type of, prep needs to be done before applying the epoxy. The floor is 2-yrs old and was exposed to the weather for approximately 6 mos prior to erecting our garage. It has set the remainder of the time with only a motorcycle parked on the cardboard until now. What should I use; how much should I use; should I neutralize any acid used; what is the best way to apply epoxy (squeegy, roller, or both); how many people are needed for efficiency; etc. Confused and need some direction.