c6 rocket
Active member
I installed a part A paint with the part B epoxy additive and it states that the drying time is 6 hours at 70 degrees. Thirty six (36) hours later and the floor is tacky but not dry. It did go down to the lower 40's the other night and the concrete is cold. Could this be a reasin why it has not cured?


Rust Oleum, Rust Oleum Pro, U Coat It, Wolverine, etc. It isn't that hard of a question.