I applied me Legacy epoxy and the last step was Tuesday, when I applied the second coat of clear. Twenty four hours later, yesterday, it was hard, and I was able to walk on it.
I’ve read “24 hours to walk on the floor”, and then it goes all over the board from there. I’ve read 3-4 days and I’ve also read “7 days to fully cure”, and hot care tire issues on fresh epoxy, etc. but I am not parking a car in my garage. And as humid as it is down here in Florida, I don’t know if that accelerates the drying / curing time or slows it down. I would think it speeds it up.
I want to move my cabinets into the garage on Saturday and maybe roll my motorcycles in there as well. That would be 4 days since date of last clear coat (tues). Am I over thinking this? Should I be ok? I can’t imagine a factory closing down for 7 days just to lay epoxy down.
Any thoughts?
I’ve read “24 hours to walk on the floor”, and then it goes all over the board from there. I’ve read 3-4 days and I’ve also read “7 days to fully cure”, and hot care tire issues on fresh epoxy, etc. but I am not parking a car in my garage. And as humid as it is down here in Florida, I don’t know if that accelerates the drying / curing time or slows it down. I would think it speeds it up.
I want to move my cabinets into the garage on Saturday and maybe roll my motorcycles in there as well. That would be 4 days since date of last clear coat (tues). Am I over thinking this? Should I be ok? I can’t imagine a factory closing down for 7 days just to lay epoxy down.
Any thoughts?