Gregdoo
Well-known member
I really want to epoxy the floor of my 2 car garage. However, there is NO way I can completely empty out the whole garage at once, especially for several days of curing. I'm hoping to push everything to one side of the garage, epoxy the other side, let it harden and then do the same thing to the other side.
The issue for me is that my concrete is 1970 era and there is not an expansion joint in the middle to make a nice clean break in the job. Is there a way to make a nice looking transition between the two jobs?
The issue for me is that my concrete is 1970 era and there is not an expansion joint in the middle to make a nice clean break in the job. Is there a way to make a nice looking transition between the two jobs?
