Just got my Coroando Coropoxy 100% solid epoxy, The label says apply at 80 sqft for 20 mils or 120sqft for 15mils. I will be somewhere in the middle as i am doing 600sqft. I have enough epoxy for two coats 1200 sqft. Should i do two coats of epoxy? My plan is to grind my floor with an edco grinder with diamond stones, Next apply 1 coat of coropoxy primer, followed by two coats of epoxy at 15-20mils per coat,do a complete broadcast of chips, wich I am ordering 80 pounds from Torginol. and then apply 1 coat of clear at about 15 mils. I am a little scared to work with this product. It has a short pot life 30 mins at 75 degrees, It hasnt been below 80 degrees at night in months and avrg day time temps are from 100-115 degrees. I think it might be wise to wait till the eveing temps cool down a bit and do the aplication while the concrete is cooling down instead of heating up. I also have a question, Where my cabinets meet the floor the installers apply a bead of white silicon, should i remove this? or tape my cabinets off here and reply a bead of silicone their after the epoxy has cured. Thanks in advance for any help.