I'm looking to coat my floor. I was planning on a gray floor with red border. I was planning on two coats of gray and then two of the red on border then clear.
Gray 1
- 16 hr wait
Gray 2
- 16 hr wait
Red 1
- 16 hr wait
Red 2
-16 hr wait
Clear coat
The clear coat goes on 16 hrs after the last red which should be fine as the clear coat can go on 16-72 hrs after the last coat, but it will go on 48 hrs after the last gray. So I'm guessing I'll be okay with that too?
Also has anyone done this many layers and will I run into any issues?
Do I maybe only need to do one of the red instead of 2 since I have 2 layers down already?
I'm also debating the Epoxyshield Pro vs. U Coat It vs. Epoxy-Coat.
Gray 1
- 16 hr wait
Gray 2
- 16 hr wait
Red 1
- 16 hr wait
Red 2
-16 hr wait
Clear coat
The clear coat goes on 16 hrs after the last red which should be fine as the clear coat can go on 16-72 hrs after the last coat, but it will go on 48 hrs after the last gray. So I'm guessing I'll be okay with that too?
Also has anyone done this many layers and will I run into any issues?
Do I maybe only need to do one of the red instead of 2 since I have 2 layers down already?
I'm also debating the Epoxyshield Pro vs. U Coat It vs. Epoxy-Coat.