I have a detached garage that has enough power for now and no need to upgrade. It’s has a 10 gauge and now that I have 240, it’s enough.
I may need more one day, don’t know for what or
How much.
I am digging an trench from the house to the garage for water line for the front of garage. Tired of dragging 100 feet of hose. Water will be off during winter.
I’m also running low voltage wire for Internet access and connectability.
Electrician recommended dropping an extra 1.5 conduit at least 18 inches, for the future power upgrade.
So how does this work, do I need to apply for a permit or inspection now, or will they dig up random spots to verify?
Adding the conduit is cheap, it means digging another few inches which is also easy.
How can I prepare for a future inspection?
I am in Maryland.
I may need more one day, don’t know for what or
How much.
I am digging an trench from the house to the garage for water line for the front of garage. Tired of dragging 100 feet of hose. Water will be off during winter.
I’m also running low voltage wire for Internet access and connectability.
Electrician recommended dropping an extra 1.5 conduit at least 18 inches, for the future power upgrade.
So how does this work, do I need to apply for a permit or inspection now, or will they dig up random spots to verify?
Adding the conduit is cheap, it means digging another few inches which is also easy.
How can I prepare for a future inspection?
I am in Maryland.
