I have a underground feed going to my well pump ,then it continues to a small, 8 stall campground that feeds 8 , 30 amp services.The feed is fed from a panel at the power source ( 200 amp) ,one line to my home and one to the well,campground.
My question is , I want to feed the main service into my new garage then continue on to the campground, as well ,supply a curciut to the well shack .
I am just about ready to pour the pad and was wondering if I should put in a electrical conduit ( a 90 deg) up into the garage before concrete or , what I was planning, is a outside connection on the exterior wall, that feeds the new breaker panel in the garage and also carries on to the campground....like a junction panel of sorts..
What is the proper way to do this?
Thanks!
My question is , I want to feed the main service into my new garage then continue on to the campground, as well ,supply a curciut to the well shack .
I am just about ready to pour the pad and was wondering if I should put in a electrical conduit ( a 90 deg) up into the garage before concrete or , what I was planning, is a outside connection on the exterior wall, that feeds the new breaker panel in the garage and also carries on to the campground....like a junction panel of sorts..
What is the proper way to do this?
Thanks!