malibu101
Well-known member
I know this has been asked before and after searching I must ask this simple question. I am helping a buddy plan and we are stumped on this.
It is not getting inspected but we want to insure that it is NEC code compliant if he were to sell the place and have it inspected.
100A subpanel feed from the house to a pole building. All in conduit and all properly sized.
He would like (2) 3-way switches at the garage door and the house door to operate exterior lights on both the garage and the house from each location.
Simple enough.
QUESTIONS-
1- Can the (8) #12 THHN run through the same conduit as the feeders to the garage? Conduit sized properly of course.
2- If so; Should they be fed from one structure or the other?
It is not getting inspected but we want to insure that it is NEC code compliant if he were to sell the place and have it inspected.
100A subpanel feed from the house to a pole building. All in conduit and all properly sized.
He would like (2) 3-way switches at the garage door and the house door to operate exterior lights on both the garage and the house from each location.
Simple enough.
QUESTIONS-
1- Can the (8) #12 THHN run through the same conduit as the feeders to the garage? Conduit sized properly of course.
2- If so; Should they be fed from one structure or the other?