I have what I think is a simple question.
I have built my shop and now I need to run a 240vac 100amp feed from the house panel (200amp with 100 amp breakers for the shop feed) to a shop panel. My local code requires a disconnect on the outside of the shop prior to the shop interior breaker panel.
Here are the feeder cable specs.:
- 100ft #1 XHHW (hot leg-1)
- 100ft #1 XHHW (hot leg-2)
- 100ft #1 XHHW (neutral leg)
- 100ft #2 XHHW (ground)
Note: I will be running copper cables from the disconnect to the interior shop breaker panel.
Questions:
- Do I connect the neutral and ground on the same "bar" in the disconnect?
- Should I use a grounding stake at the disconnect?
- Am I dorking this up and about to kill myself?
Thanks in advance,
DJ
I have built my shop and now I need to run a 240vac 100amp feed from the house panel (200amp with 100 amp breakers for the shop feed) to a shop panel. My local code requires a disconnect on the outside of the shop prior to the shop interior breaker panel.
Here are the feeder cable specs.:
- 100ft #1 XHHW (hot leg-1)
- 100ft #1 XHHW (hot leg-2)
- 100ft #1 XHHW (neutral leg)
- 100ft #2 XHHW (ground)
Note: I will be running copper cables from the disconnect to the interior shop breaker panel.
Questions:
- Do I connect the neutral and ground on the same "bar" in the disconnect?
- Should I use a grounding stake at the disconnect?
- Am I dorking this up and about to kill myself?
Thanks in advance,
DJ