UnionMan
Well-known member
Hi All.
I've done some searches and looked around but couldn't find all the info I was looking for. I'm in the process of bidding out a pole building to build a wood workshop/Garage for my home in Virginia. the building will be 40x60x12 and pole building type construction. It will house a large area for wood working tools as well as have a small closed in office area with a full bath and on the far side I would like to put in a two post lift to make servicing my vehicles and equipment easier on me. I've been also getting bids for the concrete portion of the building. I've been basing bids off a recommendation I got from a friend to get 4" of gravel, 5" of 4000psi concrete. It seems that every bid I get from companies they recommend a fiber mesh concrete over a wire mesh. There reasoning is that it has the same strength as metal wire mesh but less labor which means cheaper overall cost.
What are everyone's thoughts on concrete pads?
UnionMan
I've done some searches and looked around but couldn't find all the info I was looking for. I'm in the process of bidding out a pole building to build a wood workshop/Garage for my home in Virginia. the building will be 40x60x12 and pole building type construction. It will house a large area for wood working tools as well as have a small closed in office area with a full bath and on the far side I would like to put in a two post lift to make servicing my vehicles and equipment easier on me. I've been also getting bids for the concrete portion of the building. I've been basing bids off a recommendation I got from a friend to get 4" of gravel, 5" of 4000psi concrete. It seems that every bid I get from companies they recommend a fiber mesh concrete over a wire mesh. There reasoning is that it has the same strength as metal wire mesh but less labor which means cheaper overall cost.
What are everyone's thoughts on concrete pads?
UnionMan
