I have 2 slabs of concrete (joining buildings) that were separated with a 2x6 and some 6x6 posts. I have removed the 6x6 posts and the 2x6. I now have a 1.5 inch gap and some 5.5x5.5 inch holes to fill before epoxy.
What is the best way to fill the holes? I assume if I use a bag of concrete mix I will have to wait 30 days for it to cure before applying the epoxy?
I have checked around and can buy epoxy filler but will run about $150. And have to wait to get it shipped.
1. Do I have to wait for 30 days?
2. Hydraulic cement an option?
What is the best way to fill the holes? I assume if I use a bag of concrete mix I will have to wait 30 days for it to cure before applying the epoxy?
I have checked around and can buy epoxy filler but will run about $150. And have to wait to get it shipped.
1. Do I have to wait for 30 days?
2. Hydraulic cement an option?