Pole barn post frame build. 20 feet wide x 24 feet deep.
Using 2x6 bottom rat/form board.
At the bottomof board ill have 6inch of 57 rock.
At top of rock is my current grade.
Plan on pouring 5.5 inch slab on top of grade.
Back fill with rock around edges.

Does this sound ok?

Apron outside of garagw will be cut 2 foot. First 6 inches of approach is for trench drain.
Next 18 inch slope up to top of concrete 5.5".
My driveway is slope down heading towards the face of garage. Hense the drain.
Use drain tiles on the sides under the rock.

Looking for advice if im going right direction.
 