Here's where I am so far.
First, removing the wood top
Getting material for the frame. 1" square tubing, cost me about 40$CAN, still remains about 10ft of it after everything is done
Welding the side parts
Fitment check before final welding and bracing.
Final assembly with bracing and paint.
Sheet metal installed. A shop made it for me as I wasn't eqquiped to do it. Cost me 105$CAN for the metal + time for cutting&bending.
Look from the back, match pretty nice.
Final, with lights installed. Not sure I will keep those, I would like more lighting power. Still miss some fixtures for more tools, gotta get them tonight or tomorrow.
First, removing the wood top
Getting material for the frame. 1" square tubing, cost me about 40$CAN, still remains about 10ft of it after everything is done
Welding the side parts
Fitment check before final welding and bracing.
Final assembly with bracing and paint.
Sheet metal installed. A shop made it for me as I wasn't eqquiped to do it. Cost me 105$CAN for the metal + time for cutting&bending.
Look from the back, match pretty nice.
Final, with lights installed. Not sure I will keep those, I would like more lighting power. Still miss some fixtures for more tools, gotta get them tonight or tomorrow.