Well, finally started on my 36x48 Morton building. The site is prepped and the building will be here at high noon on 9-3-10. 8/12 pitch insulated with covered porch and a 12x48 attic.
 

Attachments

  • DSC_3613.jpg
    DSC_3613.jpg
    147 KB · Views: 361
To avoid these ads, REGISTER NOW!

pinebarkauto

Well-known member
Joined
Jun 26, 2006
Messages
67
Location
South Carolina
Congrats on the new Morton building! I hope you enjoy yours as much as I have mine. I started with a 44 X 75 with a 22 X 44 apartment in one end. I later added 44 X 50. The insulation package is incredible. The guys at Morton used to be great to work with. No such thing as cost overruns or late delivery and a outstanding warranty. I hope that is still the case. Please let us know about your experience. Be sure to install insulated doors.Chip.
 

aqr81

Well-known member
Joined
Jul 20, 2010
Messages
1,127
Location
Central Valley, Ca.
I am not familiar with a Morton Building so look forward to following the progress and seeing the pics. I envy you folks that live in areas with land and room to grow. :)
 
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
Here are some Pics.
 

Attachments

  • DSC_3641.jpg
    DSC_3641.jpg
    148.5 KB · Views: 529
  • DSC_3642.jpg
    DSC_3642.jpg
    146.5 KB · Views: 432
  • DSC_3650.jpg
    DSC_3650.jpg
    149.4 KB · Views: 446
  • DSC_3671.jpg
    DSC_3671.jpg
    149.9 KB · Views: 469
  • DSC_3675.jpg
    DSC_3675.jpg
    150.8 KB · Views: 405
  • DSC_3685.jpg
    DSC_3685.jpg
    150.5 KB · Views: 394
  • DSC_3697.jpg
    DSC_3697.jpg
    149.7 KB · Views: 419

5thRail

Active member
Joined
Aug 28, 2010
Messages
33
Location
Lex, KY
Would you mind posting some info on the cost of the building and the site prep, etc? I'm in the pre-planning stages for a similar size garage/shop/storage building and it would really help to get some real-world figures.

Thanks!
 

LuckyRugger

Well-known member
Joined
Mar 23, 2008
Messages
119
Location
Mid-Michigan
Can't believe someone is going to start building on a Saturday, and a holiday weekend at that. I guess it is a true Labor Day Weekend around your house, well hopefully not for you.
 

Bib Overalls

Well-known member
Joined
Dec 4, 2006
Messages
3,318
Location
Jonesboro, Arkansas
Friend of mine was given a Morton building that was going to be bulldozed for a commercial development. It was almost new and never used. He was able to salvage the trusses, windows, doors, and most of the lumber. Taking it down was a real job. The spikes they use are almost impossible to pull out. All of the materials were first class.
 
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
first full work day. Not too bad!
 

Attachments

  • DSC_3908.jpg
    DSC_3908.jpg
    156.6 KB · Views: 423
  • DSC_3911.jpg
    DSC_3911.jpg
    157.9 KB · Views: 384
  • DSC_3940.jpg
    DSC_3940.jpg
    151.1 KB · Views: 430
  • DSC_3941.jpg
    DSC_3941.jpg
    152.9 KB · Views: 470

4StarCstms

Well-known member
Joined
Mar 14, 2008
Messages
938
Location
Kentucky
Very Nice!! I'm diggin that forklift thats built into the one truck...thats a pretty sharp idea!!
 

trbomax

Well-known member
Joined
Mar 21, 2010
Messages
2,556
Location
starvation lake,mi.
Drilling the holes with that auger...........how do they pour and allow the footing cookies to cure before setting the posts? Up here those posts would have to be 48" deep and sitting on a 32" x 12" poured cookie that would require an inspection before posts could go in. In NW ohio ditto except the cookie only needed to be 24" x 6".

edit) the exception up here would be an agricultural building, but w/o the inspections and permits you could not insure it.
 
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
Heere are some more pics.
 

Attachments

  • DSC_4100.jpg
    DSC_4100.jpg
    147.6 KB · Views: 571
  • DSC_4105.jpg
    DSC_4105.jpg
    124.4 KB · Views: 472
  • DSC_4122.jpg
    DSC_4122.jpg
    152.3 KB · Views: 545
  • DSC_4102.jpg
    DSC_4102.jpg
    150.2 KB · Views: 599
  • DSC_4144.jpg
    DSC_4144.jpg
    143.7 KB · Views: 572
  • DSC_4166.jpg
    DSC_4166.jpg
    134.1 KB · Views: 512
To avoid these ads, REGISTER NOW!

markviii

Well-known member
Joined
Jan 25, 2010
Messages
1,310
Location
east central IL
Morton crews are excellent. We got delivery on the parts on Sept 8, 2009. They began the scheduled 18-day build Sept. 9. The crew of 3 to 4 worked 12-hour days Monday-Saturday. They stayed at a local hotel. I made them lunch a few days. They finished their part of the build in 8 days, so were out of there by Sept. 17. Tom and I taped plastic to the walls to prepare for the concrete floor (poured by an Amish crew) - Tom didn't want to deal with concrete spattered on the steel walls. Then we cut holes in the walls for the outlets, in preparation for our electricians who then came in to help Tom do all the wiring. The electricians worked after hours, evenings and weekends. The garage doors were installed the third week of October. Blown-in insulation came around the same time. We were in a race to get it enclosed before really cold weather hit.

The interesting thing about Morton is all the specialized equipment. The semi that brought in the supplies was specially designed for Morton. The forklift and the lift for the high work were pretty cool. And watching it all in operation was fascinating.

We have been extremely happy with the results from both Morton and the Amish concrete crew.

roaddog359 - your place looks great! Hope you're as pleased with yours as we are with ours.

Chris
 
Last edited:
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
Wow, that is going up in a hurry. What's the wall height? That overheard storage is going to be great!

12 feet ceiling height. walls and ceiling will be insulated. gas, water and electric coming soon also running cable and phone wire. I would like a 4 post lift next year.
 

NUTTSGT

Super Moderator
Staff member
Joined
Sep 14, 2009
Messages
50,932
Location
Northern Central Ohio
trbomax, they may not be using poued cookies but one that is prepoured and dropped in the hole.

Looks like it has scaffolding built on top of the back hoe, with folding sides. Fork lift built into the semi-tractor. Somebody doing some thinking there outside the box.


I'll be following along with this build.
 

racinman

Member
Joined
Feb 4, 2009
Messages
5
Nice building roaddog... It is great to see someone that is working on schedule... and to see it all come together is real cool. thanks for the pic's
 

Art From De Leon

Well-known member
Joined
Feb 28, 2009
Messages
2,752
Location
De Leon, Texas
A couple of pictures from when they delivered mine.

It was delivered about 6 weeks before I was expecting it, the driver called the night before and I was totally taken by surprise.

After unloading, he covered everything with thick black plastic to keep it out of the weather.

The crew that put it up had everything done in 4 days, the wind kept them from being able to put the roof on, so it took an extra day. The building is now 6 years old, and other than the wind blowing rain under the walk in door, I have had absolutely no complaints about it.
 

Attachments

  • IM000092 (Copy).jpg
    IM000092 (Copy).jpg
    118.6 KB · Views: 196
  • IM000090 (Copy).jpg
    IM000090 (Copy).jpg
    112 KB · Views: 169

aqr81

Well-known member
Joined
Jul 20, 2010
Messages
1,127
Location
Central Valley, Ca.
I wish I could do a Morton building in my area...but then again, I'd have to have more land. It seems the majority of folks here are blessed with living in an area that has a lot of open land to build sizable shops.
 
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
Her are a couple more shots. starting the electrical now, water next week.
 

Attachments

  • DSC_4213.jpg
    DSC_4213.jpg
    131.9 KB · Views: 635
  • DSC_4212.jpg
    DSC_4212.jpg
    137 KB · Views: 514
  • DSC_4215.jpg
    DSC_4215.jpg
    143.2 KB · Views: 624
  • DSC_4216.jpg
    DSC_4216.jpg
    140.6 KB · Views: 654
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
Things have slowed down a bit. I have the gas water and electric trenched in underground. The plumber, electrician and concrete guy all claim they are coming out this week to start wrapping this project up. We will see who shows up first.
 
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
The Floor is poured the electric lights HO T5 6 bulb dual ballast lights are installed. I used 6 of them. the radiant tube heater is installed, septic tank is installed, beer fridge is in place I just need to build out my bathroom. I ran phone, water,cable and Ethernet out to the building. I love my detroit radiant heater its a 2 stage unit and it works great.
 

Attachments

  • DSC_4247.jpg
    DSC_4247.jpg
    138.4 KB · Views: 258
  • DSC_4499.jpg
    DSC_4499.jpg
    130.5 KB · Views: 205

ejm1961Tbird

Well-known member
Joined
Oct 1, 2010
Messages
356
Location
Knoxville, TN
Good process roaddog! Nice to know you got the beer fridge installed! Since the posts are on concrete 4' deep in the ground, does the slab inside just float on the surface? What did you go with -- 4-5" thick, 3500 psi, with mesh or rebar? Got any good shots of the stairway and the outside of the building? Thanks
 
OP
R

roaddog359

Well-known member
Joined
Nov 25, 2009
Messages
157
Location
Northwest Indiana
I will try and take some new pictures and post them up in the next day or so. I went with 5" concrete with a 2' x 2' perimeter rat wall. fiber and wire and rebar used in floor. Cant remember without looking it up but i believe psi is over 4000.
 