I'm new to the site, but I've seen lots of good advice here. I'm building a 24 X 24 garage and the slab will be poured next week. Two questions:
1. What type of finish should I ask the contractor to put on the slab so as to minimize prep for an epoxy floor?
2. Typically, how long does the slab need to cure before the epoxy can be put down? I'm in central Florida, high heat and high humidity.
Thanks for the help!
dho
1. What type of finish should I ask the contractor to put on the slab so as to minimize prep for an epoxy floor?
2. Typically, how long does the slab need to cure before the epoxy can be put down? I'm in central Florida, high heat and high humidity.
Thanks for the help!
dho