Got my hoist about as level as I can at the lifting feet. All the anchors are tight and now I'm ready to run some cables. Doing some reading it looks like I should get some non shrink grout, how do I go about getting it under such a small gap?
Exactly. Mix non shrink grout fairly dry, pack it in.Tuck pointing trowel & pack it in
Nope…Grout under the hoist??
Why? To keep dirt out?
