To avoid these ads, REGISTER NOW!

Finishing up hoist. Question for grout?

sasq40

Active member
Joined
Feb 3, 2025
Messages
28
Got my hoist about as level as I can at the lifting feet. All the anchors are tight and now I'm ready to run some cables. Doing some reading it looks like I should get some non shrink grout, how do I go about getting it under such a small gap?
 

Attachments

  • 20250831_172732.jpg
    20250831_172732.jpg
    547.9 KB · Views: 3
  • Screenshot_20250831_173254_Home Depot.jpg
    Screenshot_20250831_173254_Home Depot.jpg
    259.6 KB · Views: 6
To avoid these ads, REGISTER NOW!
OP
S

sasq40

Active member
Joined
Feb 3, 2025
Messages
28
Awesome. I spent like two days trying to get it perfectly level and seems like each time it went out Ha, so I'm leaving it so there are maybe 1/16-1/8 off level, so I'm ready to move on lol
 
To avoid these ads, REGISTER NOW!
OP
S

sasq40

Active member
Joined
Feb 3, 2025
Messages
28
Concrete groute is structural, so adding it back under the gap will give more surface area for the post to sit on
 

nicholsmf

Well-known member
Joined
Mar 23, 2011
Messages
246
Location
TN
Use a high flow structural grout and get it in there with a grout bag or even a syringe. Filling those voids, however small, will enhance the stability and capacity to bear a load.
 
To avoid these ads, REGISTER NOW!