Great weekend for finishing up the siding on the never-ending project. A few pictures to update the progress.Time to start preparing for the concrete floor. The side door is going to be a sliding barn door.
c99c6aa585e281f418da9a4a0d8f4edd.jpg
1ef216993ead87682c97be8caa382678.jpg


Sent from my SPH-L710 using Tapatalk
 
To avoid these ads, REGISTER NOW!
OP
B

billwood437

Well-known member
Joined
Dec 4, 2015
Messages
92
Location
Massachusetts, USA
It is 26x40, and has a 2nd floor over the front 2/3rd's. A steel beam runs from between the doors back 25' with 1 post at the end. The back is cathedraled up to put a 2 post lift in. Next is the floor and electrical.

Sent from my SPH-L710 using Tapatalk
 
OP
B

billwood437

Well-known member
Joined
Dec 4, 2015
Messages
92
Location
Massachusetts, USA
My never ending project hits a big milestone, The Floor is Poured!!uploadfromtaptalk1468153912075.jpg
5" minimum with mesh and rebar at the 3 door openings. They finished smooth as glass. 8" thick area behind the post with a mat of bar 8" o.c. at the bottom where 2 post lift will sit.

Sent from my SPH-L710 using Tapatalk
 
To avoid these ads, REGISTER NOW!
OP
B

billwood437

Well-known member
Joined
Dec 4, 2015
Messages
92
Location
Massachusetts, USA
Nice looking build. How are you adjusting the grade for the man door on the side?

How long have you been working on this?
Its been about a year. I have done a lot of the work myself so it has taken longer than expected. I will have a couple of stairs out the back to a path leading to the driveway. So far the only parts I have subbed out was the foundation walls (I poured the footing), the slab and the shingles (I needed a break). I also just had the overhead doors installed.
I owe payback Labor to a few friends and family who helped with the framing. Though I would have been there for them anyway. I am going to acid stain and seal the floor. I am putting in a new 200 amp service. Fun fun fun

Sent from my SPH-L710 using Tapatalk
 
OP
B

billwood437

Well-known member
Joined
Dec 4, 2015
Messages
92
Location
Massachusetts, USA
Just finished acid stain and sealing the floor with 2 coats of sealer. Almost ready for the electrical inspection and then they can hookup the power on the pole.
1729baa347c82b5cfbc53c039627876f.jpg
3c8c1404656971ae9a6946ebefdfb618.jpg


Sent from my SM-N930P using Tapatalk
 