I've been lurking here for a while now, picking up many great ideas. We're rebuilding our garage from 20X20 to 26X26 with 12' ceilings for a lift. We're going to put PEX in the floor for radiant heat. The building is now framed and roofed and the floor is getting close. This is the scary part.
The soil in our area is clay and nasty. This will have a 6" base and the contractor is using pea stone. Not my choice, but he uses it all the time and likes the result and the fact that it self-compacts. In any case, that's in already. He was going to use 6 mil poly for vapor, but I stopped him and ordered 15 mil Perminator to use instead. Over that will go 2" rigid foam (polystyrene, I presume). Then 6X6 wire mesh with PEX attached. The plan is to pour the 3500 psi concrete to 8" to accommodate whatever lifts I plan to install.
Here's the really scary part.
Due to the location of the garage and surrounding trees and houses, we can't pump the concrete. The concrete guy is planning to run his power buckets across the floor (covering the route with plywood, I hope), dumping the concrete and then pulling up the mesh to the proper level. He says there's no other way to get it into the garage.
When I heard this I nearly crapped. Is it possible to do this without destroying the PEX, the insulation and the vapor barrier? What happens to the pea stone under that load? Will it shift and leave air gaps?
I'll have lots of the vapor barrier and I could easily put a second layer over the insulation to help protect and distribute the load.
Is this as bad as I think or am I panicking unnecessisarily? Thanks for the help.
The soil in our area is clay and nasty. This will have a 6" base and the contractor is using pea stone. Not my choice, but he uses it all the time and likes the result and the fact that it self-compacts. In any case, that's in already. He was going to use 6 mil poly for vapor, but I stopped him and ordered 15 mil Perminator to use instead. Over that will go 2" rigid foam (polystyrene, I presume). Then 6X6 wire mesh with PEX attached. The plan is to pour the 3500 psi concrete to 8" to accommodate whatever lifts I plan to install.
Here's the really scary part.
Due to the location of the garage and surrounding trees and houses, we can't pump the concrete. The concrete guy is planning to run his power buckets across the floor (covering the route with plywood, I hope), dumping the concrete and then pulling up the mesh to the proper level. He says there's no other way to get it into the garage.
When I heard this I nearly crapped. Is it possible to do this without destroying the PEX, the insulation and the vapor barrier? What happens to the pea stone under that load? Will it shift and leave air gaps?
I'll have lots of the vapor barrier and I could easily put a second layer over the insulation to help protect and distribute the load.
Is this as bad as I think or am I panicking unnecessisarily? Thanks for the help.