87brad
Member
The guys finally started on prep for my garage extension. My contractor said he is able to give me all I want but said he has been running into red tape with the floor drain I want. He was going to trench a pipe to the sewer on the other side of the yard but the building department says he will need to tie into existing lines in the house. He is trying to come up with other ways and said that he may be able to get by and sort of hide it but said it could cost a lot if an inspector finds it done without tying it in properly. Thoughts/suggestions?