Kaizen
Well-known member
Prepping my 30x36 slab that was poured last fall. Using epoxy so I plan on grinding it. The one place that I have an issue is two hundred sq feet area where they ran short and had to wait for a truck. Temps dropped and it didn't set right. Will grinding take this down ok or should I be doing something else?
Sent from my iPhone using Tapatalk
Sent from my iPhone using Tapatalk
