I hired a contractor to do the epoxy coating for me. He preped the floor last week with acid etching. He was about to go with the home depot epoxy, then I decided to use the epoxy-coat after hearing all those good words about the 100% solids. I had to order it online. The shipment will arrive tomorrow. So it's been more than 1 week since the prep work was done. Is it OK to assume that the floor is still in good shape? The garage door was shut all the time.
Also, I plan to use a primer with the epoxy-coat system. I remember seeing some product being recommended but cannot find those posts at this moment. What do people usually use as a primer? I'd like to get something tomorrow from a local store---don't want to wait for another week!
Many thanks!