Well-known member
If flooring goes first, I'll be unable to "cove" the flooring up the side of the sheetrock (if I use a professionally applied polyaspartic). If I use tile, I'd be tempted to put the floor down first to avoid a low gap around the wall that could hold liquids. But the prep for either floor will be easier without sheetrock.
What do you think?
Yes I know the following, so lecture not about:
I could use OSB
I could use VCT
Tile might crack
I could use epoxy
I could use cove base molding
I can use cement backer board for the bottom 4" of sheetrock
What do you think?
Yes I know the following, so lecture not about:
I could use OSB
I could use VCT
Tile might crack
I could use epoxy
I could use cove base molding
I can use cement backer board for the bottom 4" of sheetrock