Has there ever been a discussion on Footer and Wall verses Monlithic Slab as far as quantity of materials and Labor cost? I was discussing with a neighbor down the road about it, he believes that the quantity of poured concrete in his footer and walls equals the cost of a monolithic pour.
The advantage I see is that the walls can be done for the Carpenters to start framing, then concrete floor can be poured after as time allows for their availability. Most Concrete guys are booked out a couple of months now.