I'm getting quotes for foundation work on a 36' x 64' shop. I'm planning on stick building, and want a 48" deep footer to build the walls on. Two of the three contractors I've talked to want to pour the footer extra thick to eliminate several courses of block. For the sake of the conversation, contractor #1 wants to pour the footer 16" wide x 24" thick to eliminate two courses of block below ground, and contractor #3 wants to pour the footer 16" wide x 40" thick and only have one course of block below ground, two above.
Is this standard practice? I've never heard of this before.
They're talking about digging a 16" wide trench and floating concrete to the necessary depth. not forming it up. Both quotes include two runs of #5 rebar around the perimeter, toward the bottom of the trench.
Is this standard practice? I've never heard of this before.
They're talking about digging a 16" wide trench and floating concrete to the necessary depth. not forming it up. Both quotes include two runs of #5 rebar around the perimeter, toward the bottom of the trench.