koditten
Well-known member
When you guys figure out how much concret to purchase, how much do you figure is needed extra to be safe?
KO
KO
I always order a little extra and have a pad formed up to take the overage, if any. It can be a pad for any purpose. Extension of a walk, pad for some trash cans or hose reel or rain barrels or entry door to a shed etc.
This raises a question in my mind: Suppose I order a truck-full of concrete to pour a small foundation/slab. Not wanting the potential disaster of running out of concrete (or the concrete company shorting the load), I intentionally order -- say -- 25% more concrete than I actually need. Once my forms are full, if there is *extra* concrete still in the truck, what happens? Would the concrete folks demand to empty the mixer contents somewhere on my property, or would they just drive off with it and dump it back at their yard?
