Site prep is done for the building site. I had them add a circle drive while they were here. The barn is slotted to be built in September. I had to spray the whole area with ground clear today because the grass was growing so well.
I starting thinking about the inside and have decided to make a 16x24 wood working room to keep dust off of everything else. I'll have a stairway up to on top of the woodshop and then a few more stairs to get to the attic trusses that will be above the first 32' of the heated shop.
I starting thinking about the inside and have decided to make a 16x24 wood working room to keep dust off of everything else. I'll have a stairway up to on top of the woodshop and then a few more stairs to get to the attic trusses that will be above the first 32' of the heated shop.