Pouring a sill in a door opening tomorrow - between/in line with stemwall - so I can install doors before floor and apron is poured. It sits on a footing to below frost anyway and I want a joint between it and slabs on ground anyways.

10' opening, 7" thick, about 10" wide. Can I get away with two-by tied to stem walls and a single form tie in center? I can pack gravel against forms as well.

Thanks!
 
To avoid these ads, REGISTER NOW!

ConCretin

Well-known member
Joined
Jan 20, 2011
Messages
3,380
Location
Central Maine
A single tie in the middle of a 10' span might be OK if your form material is fairly rigid and it's secured at both ends. As a general rule of thumb for edge forms less than 12" deep, support 3/4" thick form material every 24" and 1 1/2" form material every 48". Support can be ties, stakes or braces. If your form bows, you can always add some support after the concrete is in.
 
To avoid these ads, REGISTER NOW!

larry4406

Well-known member
Joined
Jan 27, 2006
Messages
19,948
Location
Northern Virginia
Install a taught string line along the the form board, secured only at the ends and leave it in place.

This is the guide for installing the form board straight initially as well as monitoring the pour for any outward bow that may develop.
 
OP
B

billconner

Well-known member
Joined
Jul 20, 2021
Messages
6,991
Location
Thousand Islands NYS
Thanks all! Pour went well, if hectic and stressful for me. I stretched strings, added a block at center since forms bowed inward, and drove stakes at third points to prevent spreading. Sorry, no picture. Tomorrow.
 
To avoid these ads, REGISTER NOW!