Overhaulin63
Well-known member
Okay guys I need some expert advice. I am doing radiant floor heat but I understand the FormulaR250 will not be strong enough to support a 5" to 6" pour with a two post 10K lift....not sure if true.
If true I was planning on not routing the Pex tubing and 250 board in the area that will be supporting the post. Does this sound like a viable solution vs. running the FormulaR400 board though out the garage?
The garage is going to be 32x60.
Thanks in advance for any help!
If true I was planning on not routing the Pex tubing and 250 board in the area that will be supporting the post. Does this sound like a viable solution vs. running the FormulaR400 board though out the garage?
The garage is going to be 32x60.
Thanks in advance for any help!