I'm ready to start building on my foundation, which has 2" foam on the outside of the block (radiant slab). Fiber cement siding "Hardie Plank" says to leave a 1" gap above areas where water may be present, and the foam will have a z-flashing on top exposed about 1 1/2". I was wondering what you guys with this arrangement have done for a transition between the siding and foam flashing. Thanks!
