inphx
Well-known member
All,
I have read with interest many of your posts on home to garage ratios and watched some of the builds go up on line. I am building a new residence with a 50x100 toy shop penciled in.
I selected a vendor for the steel building. I have had one done before (50x40).
I need plans for the foundation ASAP because i need to get some grading equipment on site. I would like to have a lift and also some anchor pots for occaisional frame straightening. I have an f250 and some old 70's cadillacs .. nothing heavier (for now).
I have a soils report and its non expansive with some granite sub surface so i think that is good.
The foundation contract is asking me:
Type of fill: ABC _____ or Other _____ <- any suggestions?
Type of reinforcement: Wire Mesh ___ Rebar ____ Fiber Mesh ____ <- what to pick and why?
Thickness of Slab Desired ____ <- is that 4 or 6 " or what?
Type of footing; Spread ____ Pier _____
What PSI ? _________________
What prep to allow for epoxy coating or to do polished (it seems expensive)?
When i ask the building vendor they seem to feel its a personal preference - all they offer me is "A spread footing is much less costly than a pier type footing; usually a fibre type reinforcing is less costly than steel re-bar."
I went the best "value" but will pay for what i need to have, I work for my money so i dont want to go overboard but i want it done correctly. Thanks in advance for your suggestions!
I have read with interest many of your posts on home to garage ratios and watched some of the builds go up on line. I am building a new residence with a 50x100 toy shop penciled in.
I selected a vendor for the steel building. I have had one done before (50x40).
I need plans for the foundation ASAP because i need to get some grading equipment on site. I would like to have a lift and also some anchor pots for occaisional frame straightening. I have an f250 and some old 70's cadillacs .. nothing heavier (for now).
I have a soils report and its non expansive with some granite sub surface so i think that is good.
The foundation contract is asking me:
Type of fill: ABC _____ or Other _____ <- any suggestions?
Type of reinforcement: Wire Mesh ___ Rebar ____ Fiber Mesh ____ <- what to pick and why?
Thickness of Slab Desired ____ <- is that 4 or 6 " or what?
Type of footing; Spread ____ Pier _____
What PSI ? _________________
What prep to allow for epoxy coating or to do polished (it seems expensive)?
When i ask the building vendor they seem to feel its a personal preference - all they offer me is "A spread footing is much less costly than a pier type footing; usually a fibre type reinforcing is less costly than steel re-bar."
I went the best "value" but will pay for what i need to have, I work for my money so i dont want to go overboard but i want it done correctly. Thanks in advance for your suggestions!
Last edited:
