I want to do a new build on a small shop building.
The primary use would be a hobby shop for woodworking and other small projects.
I'm located about 500 feet from a river on the high bank side so there is no danger of flooding.
Because of the river the ground is mostly clay and silt. The topsoil is 8 inches to 1 foot of thick black dirt.
The building will also be located over where a large maple tree was cut down and the stump ground a few years ago.
Now I have to decide what to do for a foundation. I have trhree choices.
A perimeter foundation with footings, a slab on grade, or pole building type of structure.
Which one would you choose, and why? The building will be just over 500 sq.ft.
While cost is always a consideration I want to avoid costly mistakes.
The primary use would be a hobby shop for woodworking and other small projects.
I'm located about 500 feet from a river on the high bank side so there is no danger of flooding.
Because of the river the ground is mostly clay and silt. The topsoil is 8 inches to 1 foot of thick black dirt.
The building will also be located over where a large maple tree was cut down and the stump ground a few years ago.
Now I have to decide what to do for a foundation. I have trhree choices.
A perimeter foundation with footings, a slab on grade, or pole building type of structure.
Which one would you choose, and why? The building will be just over 500 sq.ft.
While cost is always a consideration I want to avoid costly mistakes.