I'm getting ready to get quotes on my foundation and slab for my 30x60 stick-built shop near Kokomo, IN.
I have 2 smallish trees in the way, and I'm told that it will be easier to knock them over with a hoe if I don't cut them first. Once they are out of the way, i plan to deal with the wood on my own. Also have some dirt to move to level the site.
I'm told 30x60 is too big for monolithic/turn-down, which is probably fine as I'm more comfortable with a frost-line footer. I'd ask the contractor what he recommends.
I'd like to have 1-3 courses of block or equivalent concrete wall above the slab to keep my siding of the ground and give a little more height. I may consider laying block myself.
I plan to put 2" foam under the slab and 1/2" PEX in the slab for radiant heat. I will look to the contractor for what reinforcement he prefers. I plan to offer to place the foam, steel, and PEX myself if it will save me some money.
I plan to have a 4-post lift in one bay. Checked the manufacturer's requirements, and they say minimum 4" 3000PSI, so I'm thinking 5." I will make sure to know where I plan to place the lift when i layout the PEX.
Not planning for any plumbing. Septic tank is too far away and uphill.
I'm outside of the city and the county only cares about placement, so no help from the inspector. I will be getting a permit as soon as I'm sure the dirt and concrete work won't totally blow my budget.
Anything I've missed? What questions should I ask? Any recommendations on getting the best price?
I have 2 smallish trees in the way, and I'm told that it will be easier to knock them over with a hoe if I don't cut them first. Once they are out of the way, i plan to deal with the wood on my own. Also have some dirt to move to level the site.
I'm told 30x60 is too big for monolithic/turn-down, which is probably fine as I'm more comfortable with a frost-line footer. I'd ask the contractor what he recommends.
I'd like to have 1-3 courses of block or equivalent concrete wall above the slab to keep my siding of the ground and give a little more height. I may consider laying block myself.
I plan to put 2" foam under the slab and 1/2" PEX in the slab for radiant heat. I will look to the contractor for what reinforcement he prefers. I plan to offer to place the foam, steel, and PEX myself if it will save me some money.
I plan to have a 4-post lift in one bay. Checked the manufacturer's requirements, and they say minimum 4" 3000PSI, so I'm thinking 5." I will make sure to know where I plan to place the lift when i layout the PEX.
Not planning for any plumbing. Septic tank is too far away and uphill.
I'm outside of the city and the county only cares about placement, so no help from the inspector. I will be getting a permit as soon as I'm sure the dirt and concrete work won't totally blow my budget.
Anything I've missed? What questions should I ask? Any recommendations on getting the best price?