My garage started yesterday and I already have some concerns based on what I'm seeing. Would welcome any feedback/advice from folks (before it's too late & concrete gets poured).
Foundation 'style'
-My contract says 'concrete footings' and 'block foundation', but what I think i'm getting (based on looking at the excavation) is a monolithic foundation.
...Is a monolithic 'worse'?
...Is a monolithic cheaper?
...A book I have states that the monolithic slab needs to be 6" above surrounding soil, which frankly I don't want it that high. I presume with a footing + block foundation the foundation can run up higher than the slab and therefore the slab can be, say, 2" above the surrounding soil - correct?
I'm getting a wire mesh in the slab. I presume that that mesh needs to be raised near the middle of the slab vertically... it does no good to rest it on the vapor barrier - correct?
And finally... what kind of change in elevation over 15 ft (how many inches) would be reasonable from the front edge of the slab outward into the driveway (for reasonable drainage?).
Many thanks!
Foundation 'style'
-My contract says 'concrete footings' and 'block foundation', but what I think i'm getting (based on looking at the excavation) is a monolithic foundation.
...Is a monolithic 'worse'?
...Is a monolithic cheaper?
...A book I have states that the monolithic slab needs to be 6" above surrounding soil, which frankly I don't want it that high. I presume with a footing + block foundation the foundation can run up higher than the slab and therefore the slab can be, say, 2" above the surrounding soil - correct?
I'm getting a wire mesh in the slab. I presume that that mesh needs to be raised near the middle of the slab vertically... it does no good to rest it on the vapor barrier - correct?
And finally... what kind of change in elevation over 15 ft (how many inches) would be reasonable from the front edge of the slab outward into the driveway (for reasonable drainage?).