I’ve been going back and forth on to build a pole barn or stick built garage. I shot the building site elevation, and found that the low part of the site is 40” low. So I will have to have clay hauled in and compacted and wait for it to settle. So I have a while to figure what direction I need to go with pole barn or garage. I’m pretty sure I want to go with a 40x60x12. I plan to make a wood shop on one side and a mechanics shop with lift on the other side. Any and all advice is appreciated from info on compacting clay fill and how long to wait before building to monolithic pour or stem wall? Thanks and please don’t hold back on info.