This has been almost a year in preparation. I'm thrilled to say I passed my first inspection and will pour concrete next week. I'm doing 99% of the work myself on my weekends with a quick check in from friends in the know. I've never built anything larger than a fence or a small deck so this has been quit the learning experience so far. Here is some of my progress to this point.
The Septic. I hired out. Last fall
View media item 52342
The Plan. I drew a plan of what I wanted and the engineer made it better and stamped the plans. It's a 24x26 garage with a 640sq ft apartment upstairs. The lot is pretty small and on a spring fed creek. 24' was a squeeze on the width due to the narrow lot and where I had to put my septic system. I originally planned on a 22' wide. I played around with a scale model plot plan I made and fit everything in like a puzzle. I tried to upload a pdf of my plans but the file was too large. I might try again when I have time.
I borrowed a tractor from a good, good friend. Thank god for good friends!
View media item 52356Laid some water lines/ hydrants
View media item 52355
Squaring things up!
View media item 52341
Painted ground... If only it would dig like the lines on the ground
View media item 52361
Plenty of rocks!!!
View media item 52365
Some wouldn't move... So we used them
View media item 52362
View media item 52369
Foundation work *****. I would NOT want to do this for a living! Many said to hire this out but it would defeat my plan to as much as possible solo and save the cash. I'm on a budget man!
View media item 52363
View media item 52366
View media item 52359
View media item 52373
View media item 52360
Boards went up and rebar went in. Not an easy chore alone. I scabbed the long ones to make 26'ers. Pretty heavy and awkward.
View media item 52368
Center footing
View media item 52371
My wife insisted on grass down by the creek. I was hesitant. "We got bigger fish to fry". But I'm glad she talked me into it. Nice place to cool down and dip my head in the ice cold water. She's smart.
View media item 52344
View media item 52364
View media item 52345
Concrete next week!!!
View media item 52372
The Septic. I hired out. Last fall
View media item 52342
The Plan. I drew a plan of what I wanted and the engineer made it better and stamped the plans. It's a 24x26 garage with a 640sq ft apartment upstairs. The lot is pretty small and on a spring fed creek. 24' was a squeeze on the width due to the narrow lot and where I had to put my septic system. I originally planned on a 22' wide. I played around with a scale model plot plan I made and fit everything in like a puzzle. I tried to upload a pdf of my plans but the file was too large. I might try again when I have time.
I borrowed a tractor from a good, good friend. Thank god for good friends!
View media item 52356Laid some water lines/ hydrants
View media item 52355
Squaring things up!
View media item 52341
Painted ground... If only it would dig like the lines on the ground
View media item 52361
Plenty of rocks!!!
View media item 52365
Some wouldn't move... So we used them
View media item 52362
View media item 52369
Foundation work *****. I would NOT want to do this for a living! Many said to hire this out but it would defeat my plan to as much as possible solo and save the cash. I'm on a budget man!
View media item 52363
View media item 52366
View media item 52359
View media item 52373
View media item 52360
Boards went up and rebar went in. Not an easy chore alone. I scabbed the long ones to make 26'ers. Pretty heavy and awkward.
View media item 52368
Center footing
View media item 52371
My wife insisted on grass down by the creek. I was hesitant. "We got bigger fish to fry". But I'm glad she talked me into it. Nice place to cool down and dip my head in the ice cold water. She's smart.
View media item 52344
View media item 52364
View media item 52345
Concrete next week!!!