New to the forum, but have been lurking lately as I'm building a Pole Barn (or maybe stick built...seems most would likely sway me that way). I have limited knowledge on Pole Building / Stick Built and I'm trying to spec out as much as I can in advance. I'm hoping I can get some input from the fine folks on this forum. To clarify, I'm not married to any ideas and open to ideas of all those with much more experience than myself.
To start I we had to have a significant amount of dirt moved to make room for the building. The South side of our prop was slopped maybe 10' off the driveway, then levelled out, then gradually sloped and finally again dipped down into the woods. I had an excavation company come in dig into the slop next to the driveway and level the fairly flat part. The north side of the ground is virgin ground, and maybe 1/2 to 3/4 towards the woodline there is fill. I estimate at the deepest part the fill is 3'-4'. My first dilemma came when I realized the fill was not compacted, so I either wouldn't be able to have a slab in the entire building, or I'd have to dig it up and compact it. I've gone back n forth on slabbing the side I know is good and digging it up to do it right (more on that later). For now I have a soil testing engineer coming out to test the soil compaction. My main question here is can anyone tell me a rough idea of the cost to dig up the soil and compact?
In reading these forums, and talking with others, it always seems everyone forgets to do something, or wishes they had done something different. It's given me a fair bit of paralysis by analysis. I'm hoping I can talk through the details here to ease my mind.
Purpose - The building itself will be used for mainly storage of cars/ trucks, boat, maybe a camper, tractor. Would like to have an area to put some gym equip., and would like a loft space.
General Construction Notes:
These are notes I've come up with so far from reading others posts, etc. Nothing set in stone, but want to finalize.
Size
48 x 64. I'd like to increase the 48 to maybe 56 if possible.
Construction
My general idea is to split the building in two with a dividing wall and condition one half of the space. I'd prefer to have the slab cover the entire building, but open to slab in conditioned space and rock in the nonconditioned space. I have not decided on Pole Barn vs. Stick Built. I guess I was originally set on a Pole Barn, but reading many posts has me considering otherwise. If going the Pole Barn would Permacolumns be suggested?
This building will sit with the gabled end on the north and south with all large doors on the east side. The way my land lays out I will only have access to pull vehicles into one side of the building. My general notes & questions below, feel free to make suggestions, pick them apart, or add to items I would want to spec out.
Thanks in advance for your help.
To start I we had to have a significant amount of dirt moved to make room for the building. The South side of our prop was slopped maybe 10' off the driveway, then levelled out, then gradually sloped and finally again dipped down into the woods. I had an excavation company come in dig into the slop next to the driveway and level the fairly flat part. The north side of the ground is virgin ground, and maybe 1/2 to 3/4 towards the woodline there is fill. I estimate at the deepest part the fill is 3'-4'. My first dilemma came when I realized the fill was not compacted, so I either wouldn't be able to have a slab in the entire building, or I'd have to dig it up and compact it. I've gone back n forth on slabbing the side I know is good and digging it up to do it right (more on that later). For now I have a soil testing engineer coming out to test the soil compaction. My main question here is can anyone tell me a rough idea of the cost to dig up the soil and compact?
In reading these forums, and talking with others, it always seems everyone forgets to do something, or wishes they had done something different. It's given me a fair bit of paralysis by analysis. I'm hoping I can talk through the details here to ease my mind.
Purpose - The building itself will be used for mainly storage of cars/ trucks, boat, maybe a camper, tractor. Would like to have an area to put some gym equip., and would like a loft space.
General Construction Notes:
These are notes I've come up with so far from reading others posts, etc. Nothing set in stone, but want to finalize.
Size
48 x 64. I'd like to increase the 48 to maybe 56 if possible.
Construction
My general idea is to split the building in two with a dividing wall and condition one half of the space. I'd prefer to have the slab cover the entire building, but open to slab in conditioned space and rock in the nonconditioned space. I have not decided on Pole Barn vs. Stick Built. I guess I was originally set on a Pole Barn, but reading many posts has me considering otherwise. If going the Pole Barn would Permacolumns be suggested?
This building will sit with the gabled end on the north and south with all large doors on the east side. The way my land lays out I will only have access to pull vehicles into one side of the building. My general notes & questions below, feel free to make suggestions, pick them apart, or add to items I would want to spec out.
- 16’ Side Walls
- Overhang – 1’ all the way around
- Gutters run to back of building.
- Wainscoting on everything but the back.
- Door height & Width? four doors 14 x 14
- Overhead door vs Roll up door?
- Single man door on Northeast side
- Hose Bib
- Cupola -Add two
- Vapor barrier floor
- Plastic
- Insulating foam board
- Pex tubing for radiant heat
- Floor drains (Been looking but haven't found regs on drains. If oil/water separator required can I put in drain and cap it to be cleaned out? I live in the country with septic tank)
- Sink drain
- Water line to sink and exterior hose bib
- Concrete Thickness 4” or 6” ?? Depends on what’s required for lift. ( Would like lift that can handle F250.)
- I assume the power company will need to bring electric to the building instead of taking it from the house?
- I work in commercial HVAC so I'm not too worried about getting the equipment and figuring out the load, but curious what others have used for such a space
Thanks in advance for your help.