Ceiling is completed, apart from paint and finishing.
Particle board soon completed:
Driving crushed rock for filling in behind and around the garage. I think it took 18 loads:
Insulation on the outside is done all over. Putting on the plastic:
All the crushed rock is filled back and covered:
Plastic is done too (obviously before the rock was filled back). Time: middle of august 2008 - 16 months from start.
Particle board soon completed:
Driving crushed rock for filling in behind and around the garage. I think it took 18 loads:
Insulation on the outside is done all over. Putting on the plastic:
All the crushed rock is filled back and covered:
Plastic is done too (obviously before the rock was filled back). Time: middle of august 2008 - 16 months from start.