kest874
Active member
Starting to plan out the electrical run to new detached garage (being built now).
Planning to run 2" conduit from the main panel on the side of the house. Have 2 choices, either run through the yard the entire way or through the crawl space for part of it.
There are 2 air conditioning units (marked red) on side of the house where the main panel is so I would have to go further out and come back.
I'll use MHF the entire way through conduit. Which is preferable?
If the conduit is in the crawl space should it be brought up and attached to the floor joists or can it be simply on grade?
There is a septic tank and leech fields I will need to avoid in the back yard.
I've attached pictures of bother options.
Planning to run 2" conduit from the main panel on the side of the house. Have 2 choices, either run through the yard the entire way or through the crawl space for part of it.
There are 2 air conditioning units (marked red) on side of the house where the main panel is so I would have to go further out and come back.
I'll use MHF the entire way through conduit. Which is preferable?
If the conduit is in the crawl space should it be brought up and attached to the floor joists or can it be simply on grade?
There is a septic tank and leech fields I will need to avoid in the back yard.
I've attached pictures of bother options.