I'm building a new house (acting as my own general contractor...everybody needs a hobby right?). The garage will be a 3-car+, about 1100 square ft with 12' 2" ceiling....with attached house. An 18 ft and an 8 ft door, direct access to basement. I have basement walls done, had the garage foundation trenched, footers and block done last week and the rough carpenter starts Monday.
If a 2 post lift is in the plans down the road do I need to do anything special with the garage floor?