I have just completed placing 4-5 inches of screened gravel on the floor of a 18 x 18 foot space. It has been packed by the skid-steer driving on it but will also rent a compactor before putting the wire mesh down. I was going to use 2-3 ' high rocks to place under the wire mesh to hold the mesh from the gravel base. Would like to see the mesh in the center of the 5" cement. Anyone see any problem with doing this?
