Two and a half years ago my wife and I closed on our new home.
Garage is 20' wide 34' deep 10' ceiling height.
Right off the bat I did some upgrades to hold me over until I could do it the way I wanted.
Didn't look too promising while under construction.
![]()
![]()
![]()
The day after closing we moved in, the day after that the electrician showed up to install my lighting.
![]()
Once the electrician was finished I started painting so I could hang the 65" TV which is also my secondary monitor for my office PC.
![]()
![]()
![]()
![]()
Painting done, TV installed and cabinets in place.
![]()
A couple of weeks later I installed my LG 24K BTU Mini Split AC and had the local AC company come out and do the initial startup.
Unfortunately there are no pics pf the install.
Fast forward to June 2020.I ordered my new cabinets and flooring. I went with Swisstrax Ribtrax.
![]()
As my luck would have it, the cabinets and flooring showed up a week early and a good friend dropped off his TT 09 ZO6 for a paint correction. I was supposed to get the car two months prior, and I still had to paint the block walls a brighter semi gloss white.
I did get most of the painting done before the cabinets and flooring showed up. I also cleaned up a lot of detail work the builder missed before painting.
![]()
![]()
Breaking down the old cabinets. They served their purpose over the last nine years.
![]()
![]()
The next day the cabinets showed up along with 18 boxes of Swisstrax tiles.
![]()
![]()
![]()
![]()
![]()
Flooring complete for the most part. Had to borrow a table saw to trim some of the tile.
![]()
Also upgraded the garage TV to 70" and swapped the 50" monitor in my office with the 65" that was in the garage and assembled the cabinets.
![]()
![]()
![]()
The four center cabinets are getting floated off the floor but one was damaged in shipping and I had to wait for the replacement to show up.
Fast forward to a week ago. The replacement showed up and now I can finish installing and setting up the cabinets.
![]()
![]()
![]()
![]()
![]()
![]()
Next up will be a side mount door opener and some crown molding on the grey walls to class it up a little more.
Thanks for looking.
You need to remove the 's' from https with imgur. Garage looks great!

They're working in your first post now.