Its been about 4 years since i have sunk any money into the garage/shop.
So since its winter and things are kinda boring i thought i would share my progress.
updates included
- insulating the surrounding wall, except for the west wall for future purposes
- vertical mounted t5 lights, could only afford 1 but will do 3
- paint with most reflective white paint as possible
- drylock the drywall to cement for water issues as the stall has no drains
before
During
New door
celebration party , beer pong on old door
The Ceiling will get done someday, as the west wall will to. funds are tight and im very excited to just get done what i could
8)
And of course a thanks out to adam (zorba2.0) John, Ridge, Ryan (rabbitmangti), Kingston, and my Dad for helping me with the upgrade!
So since its winter and things are kinda boring i thought i would share my progress.
updates included
- insulating the surrounding wall, except for the west wall for future purposes
- vertical mounted t5 lights, could only afford 1 but will do 3
- paint with most reflective white paint as possible
- drylock the drywall to cement for water issues as the stall has no drains
before
During
New door
celebration party , beer pong on old door
The Ceiling will get done someday, as the west wall will to. funds are tight and im very excited to just get done what i could
8)
And of course a thanks out to adam (zorba2.0) John, Ridge, Ryan (rabbitmangti), Kingston, and my Dad for helping me with the upgrade!