Even if you put a sub in the garage, each circuit run into the shed will need a disconnect.
All disconnects will need to be grouped within the shed per NEC. This becomes a bigger PIA than just running a single sub panel with its own disconnect.
You could still run a sub panel (shed) from another sub panel (garage), assuming you even need a sub in the garage.
Read NEC 225.30 or.33, or somewhere thereabouts.
All disconnects will need to be grouped within the shed per NEC. This becomes a bigger PIA than just running a single sub panel with its own disconnect.
You could still run a sub panel (shed) from another sub panel (garage), assuming you even need a sub in the garage.
Read NEC 225.30 or.33, or somewhere thereabouts.