Ok, so I haven't been posting lately. I haven't had too much progress. I did have a decent weekend, so here are the past few weeks summed up:
I have the rim board up and around the perimeter. I framed out the stair opening. I was able to cut stringers and build the landing.
View media item 74772
Decked the joists with 3/4" Advantech boards. Please note, for people who plan to use this decking that haven't used it before... the sheets are 4'x8', BUT you lose about a half inch every sheet because the of the tongue and groove. I was all excited when I got to the last row, but realized I was about 2-1/2" short. I remeasured my building and was 24' wide, then looked at the boards and measured them and realized the error of my install. I should have ripped a sheet in half for the first row so I had enough on the last one. See here:
View media item 74775View media item 74774View media item 74773
So, what I did with the recommendation of a very helpful person is used Simpson Z-2 clips and installed a row of 2x4 backing at 23" from the rim board. Cut the 4' sheet and drove it into the groove of the previous row. Then the last row I installed was a 23" sheet that was butted with an 1/8" gap to the previous row, but had the 2x4 backing. See here:
View media item 74774
Now, since that was all behind us we move on to building the shed dormer walls and one of these:
View media item 74776
I now have the two shed dormer walls framed laying down. I am going to sheath them laying down. The walls are 7' - 1 1/2" tall so with 8' of sheathing the sheathing will overlap down over the rim board tying it in nicely structurally. I figure if I can get the framing square before I sheath it I should be good to go. The deck is level so I shouldn't have an issue with it being straight after sheathing. Plus, this will avoid carrying sheets up a ladder or scaffolding, installing and nailing them at height. So, hopefully this week I can get the two shed dormer walls stood and braced. Then next weekend get the rake walls built and stand them up next week. Then, it will be time for the ridge beam and rafters. I need to get this thing closed up and roofed before winter hits. My time is narrowing, so I need to start moving faster.
Here is how I left it last night:
View media item 74771
View media item 74769
View media item 74770