Yesterday I was able to Close the deal on my Dream Shop.
This is my First Property Purchase, and at 28 im pretty happy about that.
The Unit is Located in Garage Oasis in SPring Texas. and is Now Sold Out, with no room for expansion. This Unit was the largest available without buying multiple units.
Unit Size 40ft x 43ft Deep x 19ft to the Eves
SQFT= 1720
Slab is 5" thick designed for lifts to be installed on it.
A/c / heat above the bathroom Addition.
Here is the Property Layout:
Image from Garageoasis.com
Entrance:
Image from Garageoasis.com
Club House:
Image from Garageoasis.com
Image from Garageoasis.com
Image from Garageoasis.com
Day 1 on site to look at property Back in Feburary
March 28th Progress is moving along smoothly, Me talking to Job Foreman
https://lh6.googleusercontent.com/-...608-no/1799000_4009371370513_1941128707_o.jpg
This is the Day i made a written Commitment to the property March 28th
https://lh3.googleusercontent.com/-...h608-no/1898788_4009370530492_613419089_o.jpg
Cars and Coffee June 2014, we stopped by after the event to check on progress.
Fast Forward to Present day.
as you saw in the earlier bathroom picture it didn't have a TP holder or the Seat that i had asked the Contractor to use. And i honestly thought they forgot. but i was pleasantly surprised when i opened up the door Yesterday they listened.
Real Carbon Fiber Flamed Seat for the Throne.
and to top it all off the awesome TP holder
Stay Tuned For the Flooring and Machinery Updates after i go make some more money.
This is my First Property Purchase, and at 28 im pretty happy about that.
The Unit is Located in Garage Oasis in SPring Texas. and is Now Sold Out, with no room for expansion. This Unit was the largest available without buying multiple units.
Unit Size 40ft x 43ft Deep x 19ft to the Eves
SQFT= 1720
Slab is 5" thick designed for lifts to be installed on it.
A/c / heat above the bathroom Addition.
Here is the Property Layout:
Image from Garageoasis.com
Entrance:
Image from Garageoasis.com
Club House:
Image from Garageoasis.com
Image from Garageoasis.com
Image from Garageoasis.com
Day 1 on site to look at property Back in Feburary
March 28th Progress is moving along smoothly, Me talking to Job Foreman
https://lh6.googleusercontent.com/-...608-no/1799000_4009371370513_1941128707_o.jpg
This is the Day i made a written Commitment to the property March 28th
https://lh3.googleusercontent.com/-...h608-no/1898788_4009370530492_613419089_o.jpg
Cars and Coffee June 2014, we stopped by after the event to check on progress.
Fast Forward to Present day.
as you saw in the earlier bathroom picture it didn't have a TP holder or the Seat that i had asked the Contractor to use. And i honestly thought they forgot. but i was pleasantly surprised when i opened up the door Yesterday they listened.
and to top it all off the awesome TP holder
Stay Tuned For the Flooring and Machinery Updates after i go make some more money.













![20151220_165021[1].jpg 20151220_165021[1].jpg](https://www.garagejournal.com/forum/data/attachments/424/424156-cc5e1c4c901e5e9fedb84178b670e372.jpg)
![20151220_165029[1].jpg 20151220_165029[1].jpg](https://www.garagejournal.com/forum/data/attachments/424/424199-68e7493417e0640d3f0606e4e721eec6.jpg)
![20151224_174035[1].jpg 20151224_174035[1].jpg](https://www.garagejournal.com/forum/data/attachments/424/424265-4b7488b248c46786651dab19a15caf58.jpg)
![20151223_172132[1].jpg 20151223_172132[1].jpg](https://www.garagejournal.com/forum/data/attachments/424/424225-f05e46fa8b675ddb19548f7db568bd7e.jpg)