You really gave a useless amount of information on your first post ever. What type of finish are you looking for? A shell, electric, water, drywall, open studs, insulation, heat, AC, you doing all the work? Are you hiring this all out? Are you hiring certain parts out? What does the site look like? Do trees need to come down? How far from your current house? What type of siding?
$30k in materials seems like a good starting point. That means you are doing all the work, digging footers, framing, roofing, and siding. This would be for a shell only.
You want to add extras, add cost:
Electrical: $5,000
Insulation: $5,000
Drywall or some other interior wall covering: $2-$5k depending if you finish the upstairs
Heater: $1,000-$3,000 depending if you do in floor heat, forced heat, wood, propane
Concrete drive way up to it: $3,000
If you hired this out, double all those numbers.