Depends greatly on your ground conditions, temps, soil type and composition... In northern ohio vertical bores ( wells ) average 135-150 feet per ton, horizontal loops can be 300-600 feet again depending... The pipping, HDPE, is relativity cheap per foot but requires specialized tools to fuse it properly, along with skills...
The cost is in the labor and equipment... The last 4 ton horizontal loop we had done was $6200 installed, the 4 ton geothermal unit and duct system was $16k
So figure $23k
total minus 30% back -$6900.
So $16,100. Total
Typical furnace and AC in a new house runs around 10-12
If your in an area where natural gas is not available geothermal really is the best way to go...