I'm finally pulling the trigger on a lift.
Picking up the RTP9-9000 as it is the only ALI certified lift that works with a 10'6 ceiling.
http://www.revolutionlift.com/RTP9-9000-Pound-Capacity-Two-Post-Lift-P1C3.aspx
http://www.autolift.org/ali-directo...roductbrand=All&rateload=&searchsubmit=Search
Did a fair amount of research on this and 10ft ceilings aren't uncommon, so maybe this will help someone out.
Cutting two 4 foot by 4 foot holes in my 2.5in pad on Sunday then digging everything out 5 inches and some along the underside of the 2.5in pad. Then having a guy out to pour as soon as I finish.
How long does everyone think I should wait after the pour to install the lift? I've seen between 48 hours to 4 weeks listed as cure times.
How long has everyone else waited until they installed the lift?
Picking up the RTP9-9000 as it is the only ALI certified lift that works with a 10'6 ceiling.
http://www.revolutionlift.com/RTP9-9000-Pound-Capacity-Two-Post-Lift-P1C3.aspx
http://www.autolift.org/ali-directo...roductbrand=All&rateload=&searchsubmit=Search
Did a fair amount of research on this and 10ft ceilings aren't uncommon, so maybe this will help someone out.
Cutting two 4 foot by 4 foot holes in my 2.5in pad on Sunday then digging everything out 5 inches and some along the underside of the 2.5in pad. Then having a guy out to pour as soon as I finish.
How long does everyone think I should wait after the pour to install the lift? I've seen between 48 hours to 4 weeks listed as cure times.
How long has everyone else waited until they installed the lift?