Mike.VA
Well-known member
In am getting ready to run the conduit and digging the area out.
I plan to drive rebar into the ground at angles In the hole and then wire them together and then mix and pour about 4 bags of concrete.
It will end up to be a 24x24 x 4
Then a 18" hole in the center about 16" deep.
Does that seem to be enough to hold this ?

I plan to drive rebar into the ground at angles In the hole and then wire them together and then mix and pour about 4 bags of concrete.
It will end up to be a 24x24 x 4
Then a 18" hole in the center about 16" deep.
Does that seem to be enough to hold this ?